Here is the current deal-
Pit is done. Concrete forms are about 1/3 done.
The concrete mix is on site, along with the re-mesh and rebar.
Plan is to pour Saturday, September 27th at 0900 weather permitting (no torrential downpours within 24 hours)
Depending on how much I can knock out between flights this week, we may just start pouring once I get enough guys on site to start up. If I am swamped, there may still be some form and re-bar work to be done. I have an "event" up on FB, but this is for the locals who are not on that or did not get the memo.
I figure we need at least 5 guys to do it. 2 to mix/run bags, 1 to pour and tap forms, and 2 to run the screed boards. The more we get, it gets easier because we will have runners (to lowes for OH CRAP WE NEED MORE XX runs and for Food/Beer/Soda) and cooks/random helpers.
I'll have a mixer and some basic tools from public works, but if you have any concrete tools, please bring them. I have done concrete work in the past on the farm and at home, but if there is a "Concrete Expert" around, I would appreciate someone who is better with it than me to help and provide pointers.
Planning on having coolers full of soda/beer/water and firing up the grill on the O-Club patio.
If someone has a good outdoor radio, bring that.
PM/EMail or call me if you have questions. I know with the Weps Det going out, it's gonna be short on people, so any help I can get is great, and appreciated.