For all of you that are waiting to start the pipeline...don't let any of this taint your desires to go to primary one location or the other. IT WILL ALL CHANGE... the wait times, the lengths of the pipeline, the """"better"""" squadron, which squadron has more standyby, which squadron has better % of getting jets...etc etc
For an example, when I went through Corpus there was absolutely no wait to start primary. VT-28 had no sim standby but was known for it's sim "double-pumps" and 28 guys were getting through the syllabus 4-6 weeks faster than 27 guys at the time. Several months after I left it flip-flopped.
Back on topic, I still vividly remember the Bldg 89 smell, instant depression every time I walked into that Bldg....smelled like coffee and dead people.