've been solely focused on studying for the ASTB and haven't talked to a recruiter yet. I thought by the time I make first contact I'll be ready to take the ASTB, schedule a date for MEPS and get my package turned in albeit I was told getting your package together is a lengthy process (which can take up to year), I was hoping to have mine all completed before the next SNA board on the third of April. Is this feasible? I just never thought getting your package together would take long. Thank you