How else do you think they're going to make the steam?We should go back to coal fired steam ships while we are at it.
The new JFK is going to hurtle into battle at 10 knots, or as fast as the guys at the boilers can shovel.
How else do you think they're going to make the steam?We should go back to coal fired steam ships while we are at it.
Where is Hendrix in all this? Is that a story?I fear that our acting SecNav lacks the ability to see past ideological loyalties and tell his masters what a colossally stupid idea this is. I'm sure Jerry Hendrix's head is nodding continuously like a cheap dashboard bobble head.
He's the Associate Director for Shipbuilding Programs at OMB.Where is Hendrix in all this? Is that a story?
I say the following as an EMALS true believer and attendee of the PMA-251 change of command yesterday. All signs point to 81 having steam cats. Slow roll does not look like a viable COA.I presume this will get slow rolled and Trump will move on to the next shiny object placed in front of him. This would apply to CVN-81 and subsequent. This obviously deserves the most forceful pushback possible.
I say the following as an EMALS true believer and attendee of the PMA-251 change of command yesterday. All signs point to 81 having steam cats. Slow roll does not look like a viable COA.
If it were possible, I would sell the shoes on my feet to bet on Miller having EMALS.I say the following as an EMALS true believer and attendee of the PMA-251 change of command yesterday. All signs point to 81 having steam cats. Slow roll does not look like a viable COA.
Steam is mature and simple. EMALS is complex and expensive. That's the Cliff's Notes version.That is... so stupid. When people wonder why we can't build anything anymore, this. This is why.
Not that I normally care, but out of pure masochistic curiosity, what's the Trumpian cartoon-world faux-logic behind this ridiculousness?
OK...I'm sure Kalshi and Polymarket will have predictions for it up shortly. Best of luck.If it were possible, I would sell the shoes on my feet to bet on Miller having EMALS.
I just don't understand how all signs point to Miller having steam catapults. From my perspective, it looks like the only sign is a presidential memo whose only deliverable is a plan due in 60 days. Work on CVN-81 has already started. Hull units are in fabrication right now, built to accommodate an EMALS system paid for and 50% complete. Architecture for a steam system would have to be designed before that steel got cut, and it would require a serious redesign of the drawings and redevelopment of the product model first.OK...I'm sure Kalshi and Polymarket will have predictions for it up shortly. Best of luck.
From your perch, what role does Congress play in the process? How about rescinding the EO in January 2028?I say the following as an EMALS true believer and attendee of the PMA-251 change of command yesterday. All signs point to 81 having steam cats. Slow roll does not look like a viable COA.