I have been reading a lot of questions about it so...
"The Boeing Co. received a contract for a system design and development (S&D) of the EA-18G, an airborne electronic attack aircraft based on the F/A-18F. The five-year S&D programs runs from FY 04 until FY 09, and includes labratory, ground testing and flight testing"
- Page 7 of Naval Aviation News March-April 04'

"The Boeing Co. received a contract for a system design and development (S&D) of the EA-18G, an airborne electronic attack aircraft based on the F/A-18F. The five-year S&D programs runs from FY 04 until FY 09, and includes labratory, ground testing and flight testing"
- Page 7 of Naval Aviation News March-April 04'