If I were to have some place to go now, 1120, I could be moving by 1200 if I hurried (say incoming Godzilla/Giant Manatee attack).
If I was going to fill the water tank, move the dishes to the lower cabinet, etc.. About a full hour.
If there was no pile of NATOPS on the couch, a disassembled gun on the dinette and the TV area did not have 20 DVD in chaos, it actually takes about 30 minutes to pull in the slides, crank up the stab jacks, disconnect and stow the services lines (water, power, sewer, cable if it's on) and hook the truck up. Being a weight distribiuting hitch, theres a lot of running back and forth to grab the htich head, spring bars, sway control and the levers to install them.
2 people can get this on the road in about 15. I have to run in-out-in a lot when moving slides, jacking, backing, etc.