Truth that it was the bracket that the rudder pedals attached to that was wearing out. I was AFDO the afternoon it happened. They had a diagram of it at aircraft issue (which most didn't see because they weren't getting issued aircraft). It took a long time at Whiting to make any headway. Each squadron was getting about three planes a day for about six weeks. I went 31 days between graded events one time, and this was during the last block before soloing. A company came in and set up a little assembly line in one of the hangars and was able to put out about three planes a day. I had the opportunity to go over and look at it since I was still briefing every day and not flying. They had to pull out the instrument panel just to get to the bad part. For what it's worth, people are absolutely torching through the syllabus right now, which is better than before the rudder pedal issue.